Third Party Funds Group - Sub project
Acronym: DFG/TRR 154 C03
Start date : 01.06.2018
End date : 31.05.2022
Turnpike results provide connections between the solutions of transient and the corresponding stationary optimal control problems that are often used as models in the control of gas transport networks. In this way turnpike results give a theoretical foundation for the approximation of transient optimal controls by the solutions of stationary optimal control problems that have a simpler structure. Turnpike studies can also be considered as investigations of the structure of the transient optimal controls. In the best case the stationary optimal controls approximate the transient optimal controls exponentially fast.