Combined Optimization, Simulation and Grid Analysis of the German Electrical Power System in an European Context (KOSiNeK)
Third Party Funds Group - Overall project
Acronym:
KOSiNeK
Start date :
01.10.2016
End date :
30.09.2019
Combined Optimization, Simulation and Grid Analysis of the German Electrical Power System in an European Context (KOSiNeK) - Presentation of the research project and first results (2018)
Steber D, Pruckner M, Thurner C, Burlacu R, Graber T, Deß T, Luther M, et al.
Conference contribution, Conference Contribution
Ein Regionenmodell zur Herleitung der lokalen elektrischen Residuallast und thermischen Last in Deutschland (2018)
Steber D, Hümmer B, Gürtner C, German R, Pruckner M
Conference contribution, Conference Contribution
Including a virtual battery storage into thermal unit commitment (2017)
Steber D, Pruckner M, Schlund J, Bazan P, German R
Journal article, Original article