DFG / Sonderforschungsbereich (SFB)

Abbreviation: SFB

close-button

Project Types

Third Party Funds Group - Overall project
Third Party Funds Group - Sub project
Third party funded individual grant
Internally funded project
FAU own research funding: EFI / IZKF / EAM ...
Non-FAU Project

Status

Project year

From
To
Atomistic investigations of catalysis at liquid interfaces by density-functional calculations (M01) (SFB 1452 CLINT M01) Catalysis at Liquid Interfaces (CLINT) (SFB 1452 CLINT) Jan. 1, 2021 - Dec. 31, 2024 Advanced SCILLs in electrosynthesis: Understanding and tailoring selective hydrogenation an dehydrogenation at ionic liquid interfaces (C05) (SFB 1452 CLINT C05) Catalysis at Liquid Interfaces (CLINT) (SFB 1452 CLINT) Jan. 1, 2021 - Dec. 31, 2024 Understanding surface modification and stability of Advanced SCILL (C04) (SFB 1452 CLINT C04) Catalysis at Liquid Interfaces (CLINT) (SFB 1452 CLINT) Jan. 1, 2021 - Dec. 31, 2024 Molecular interactions and reaction mechanisms in Advanced SCILLs: From ideal model experiments to real materials and operando studies (C03) (SFB 1452 CLINT C03) Catalysis at Liquid Interfaces (CLINT) (SFB 1452 CLINT) Jan. 1, 2021 - Dec. 31, 2024 Surface and interface science studies of Advanced SCILL systems (C02) (SFB 1452 CLINT C02) Catalysis at Liquid Interfaces (CLINT) (SFB 1452 CLINT) Jan. 1, 2021 - Dec. 31, 2024 SCILL with mono- and bifunctional ionic liquids for selective hydrogenation reactions (C01) (SFB 1452 CLINT C01) Catalysis at Liquid Interfaces (CLINT) (SFB 1452 CLINT) Jan. 1, 2021 - Dec. 31, 2024 Influencing SILP catalyst performance by the location of reaction (B06) (SFB 1452 CLINT B06) Catalysis at Liquid Interfaces (CLINT) (SFB 1452 CLINT) Jan. 1, 2021 - Dec. 31, 2024 Solid-state NMR investigations of SILP-based catalysts (B05) (SFB 1452 CLINT B05) Catalysis at Liquid Interfaces (CLINT) (SFB 1452 CLINT) Jan. 1, 2021 - Dec. 31, 2024 Properties of the gas/liquid interface of Interface-enhanced SILP systems (B04) (SFB 1452 CLINT B04) Catalysis at Liquid Interfaces (CLINT) (SFB 1452 CLINT) Jan. 1, 2021 - Dec. 31, 2024 Support design for enhanced catalytic activity of SILP systems (B03) (SFB 1452 CLINT B03) Catalysis at Liquid Interfaces (CLINT) (SFB 1452 CLINT) Jan. 1, 2021 - Dec. 31, 2024