De-Risking Grid Forming Battery Energy Storage Projects - Grid Code Compliance testing of a 50 MW Storage System using Control-Hardware-in-the-Loop

Bammes A, Wagner T, Tripathi A, Mehlmann G, Luther M, Lalinovci A, Braun B, Henninger S, Hill J, Hubschneider S (2025)


Publication Language: English

Publication Type: Conference contribution, Conference Contribution

Publication year: 2025

Publisher: CIGRE

Book Volume: Symposium Montreal

Conference Proceedings Title: CIGRE 2025 International Symposium Montréal

Event location: Palais des Congrès de Montréal, Québec, Canada CA

URI: https://www.e-cigre.org/publications/detail/symp-mon-2025-symposium-montreal.html

Abstract

The grid code compliance of a 50 MW battery energy storage system (BESS) with a power

plant controller (PPC) is validated through detailed analysis and testing. A real-time capable

test setup is developed, integrating the PPC via Control-Hardware-in-the-Loop (CHiL) as the

device under test (DuT). By connecting the controller to the simulated point of

connection (POC), the test environment replicates field conditions. Various test cases evaluate

PPC performance under critical grid code requirements, while additional tests, such as power

oscillation damping (POD), address additional specifications from the national grid operator

and the developer. To ensure reproducibility and user-friendliness, test execution is automated

via a Python API-based graphical user interface (GUI). The successful validation of both gridforming

and grid-following operation demonstrates how CHiL testing mitigates field

integration risks.

Authors with CRIS profile

Involved external institutions

How to cite

APA:

Bammes, A., Wagner, T., Tripathi, A., Mehlmann, G., Luther, M., Lalinovci, A.,... Hubschneider, S. (2025). De-Risking Grid Forming Battery Energy Storage Projects - Grid Code Compliance testing of a 50 MW Storage System using Control-Hardware-in-the-Loop. In CIGRE 2025 International Symposium Montréal. Palais des Congrès de Montréal, Québec, Canada, CA: CIGRE.

MLA:

Bammes, Andreas, et al. "De-Risking Grid Forming Battery Energy Storage Projects - Grid Code Compliance testing of a 50 MW Storage System using Control-Hardware-in-the-Loop." Proceedings of the CIGRE 2025 International Symposium, Palais des Congrès de Montréal, Québec, Canada CIGRE, 2025.

BibTeX: Download